PT. BERAU BARA ENERGI
|
Location |
: |
Sambarata, Berau, East Kalimantan |
|
Client |
: |
PT. Berau Bara Energi |
|
Type of Contract |
: |
OB Removal, Coal Getting and Coal Hauling to CPP |
|
Contract Period |
: |
October 2007 - October 2011 |
Project location at PT. Berau Bara Energi (owner concession), Sambarata, Bearu,
East Kalimantan.
Contract validity up to October 2011.
Production target is 125,000 MT coal per month with average striping ration 6.
Madhani's scope of works are excavate including drilling and blasting overburden,
haul, dump and spread at waste dump area, extraction and hauling ROM coal and road
maintenance from 25 km distances to CPP (Coal Processing Plant) |
 |