PT. PUTRA BARA MITRA
|
Location |
: |
Pengaron, Banjar Regency, South
Kalimantan |
|
Client |
: |
PT. Putra Bara Mitra |
|
Type of Contract |
: |
OB Removal, Coal Getting & Coal Hauling
to CCP |
|
Contract Period |
: |
September 2006 - March 2008 |
Project location at PT. Putra Bara Mitra ( Owner Concession ),
Pengaron Banjar Regency, South Kalimantan. Contract validity up to
2008.
Production target is 50.000 MT coal per month with average
striping ratio 8. Madhani's scope of works are mine 0.7 million tonne
including drill and blast, clean, load and haul coal to stockpile (
41 km
) including road maintenance, re-topsoiling and revegetation
disposal area.
|
 |