PT. SANGA COAL INDONESIA
|
Location |
: |
Batudinding, Kutai Kartanegara, East Kalimantan |
|
Client |
: |
PT. Sanga Coal Indonesia |
|
Type of Contract |
: |
Total Mining Services |
|
Contract Period |
: |
July 2008 - June 2012 |
Project location at PT. Borneo Emas Hitam (owner concession), Batudinding, Kutai
Kartanegara,
East Kalimantan.
Contract validity up to August 2011.
Production target is 50,000 MT coal per month with average striping ratio 16.
Madhani's scope of works are excavate including drilling and blasting overburden,
haul, dump and spread at waste dump area, extraction and hauling ROM coal and road
maintenance for 3 km distances to CPP (Coal Processing Plant(, coal crushing and
load coal to the barges. |
 |